Watermelon seedlings are sensitive to environmental conditions. Therefore, to cultivate melon seedlings in protected areas in the spring, corresponding measures must be taken in light of changes in the weather.
As long as it does not rain during the nursery period, it must be lifted during the day to increase the scattered light, and it should not be avoided for several days. Foggy weather should not only seal the seedbed and avoid the entrance of fog, but must also promptly remove the covering after the mist has completely dissipated, and properly conduct ventilation and light transmission. In order to prevent the air humidity, watermelon melon seedling leaves are prone to water, easily infected with anthrax and damping-off. In case of severe winds and cold weather, early cover should be properly covered, and thermal insulation measures should be strengthened at night. In addition to strengthening the field management during the seedling stage, seedlings should be sprayed with new high-fat membranes in a timely manner, and a flexible transparent protective film can be quickly formed to improve the respiration quality of the plants. This will not only affect the light but also improve the respiration quality. It can enhance the impact of the seedlings against the changes of the natural environment (such as rain, strong winds, cold currents, etc.), protect the seedlings and prevent the leaf area water from infecting pests and diseases when the fog is reduced.
After another long cloudy storm, it was appropriate to open up early in the morning to allow the melon seedlings to gradually see the light and to adapt to the glare light for a long time. When the temperature rises to a certain degree, it can be covered with grass cover on a bed to ease the withering. It is also possible to ventilate before the storm and reduce the temperature inside the seedbed.
Advantages
Imported raw materials from German to stable product quality.
We uphold integrity and strict quality control,and the export rate of return of zero.(peers3.5%)
Lot number, manufacture date,use by/expiry date are printed clearly on the box and label.
We have a system for recording production bath numbers and tracking product after-sales problems.
Keto Strips Amazon,Keto Mojo Test Strips,Keto Mojo Ketone Levels,Keto Mojo Glucose Strips
Changchun LYZ Technology Co., Ltd , https://www.lyzinstruments.com