Automatic packaging equipment cuff packaging machine operation precautions

Automatic packaging equipment cuff packaging machine operation precautions Operation sequence:

1. Turn on the power switch 10 minutes before the machine is running. 2. Temperature controller: set the temperature of 165-175oC and work at normal temperature.

3. Film installation: Adjust the rubber positioning wheel so that the film is placed in the center of the drum.

4. Pull out the installed adhesive film from below, press the rollers around the diameter to make the upper and lower glues meet the seals. After the meeting, overlap and merge a section, so that the upper and lower sealing seats are pressed, and the manual sealing switch is pressed to make the upper and lower sides The film is sealed to one side.

Precautions:

1. Installation should first consider the amount of work and transportation space to facilitate work requirements.

2, the body should be placed in a bright and dry place, do not put in a dark, humid, dripping place.

3. Do not face the ventilation system when the body is placed, so as to prevent the film from being unstable.

4. The body should be away from dust, flammable, explosive and corrosive gases.

Personal Protective Clothing

Protective Clothing,Protective Coverall,Protective Coverall Suit,Full Body Protection Suit

Taizhou huangyan Yiman industry & trade limited , https://www.yimancoverall.com