Because of the good water quality and the excellent live bait, ie, oysters, weeds can reduce feeding costs and improve economic efficiency. Now introduce its technical points: Build the pool. The cement pool was built in a place with sunny wind, year-round flowing water and a quiet environment. The wall of the pool is about 70 centimeters high, with inlets and outlets below the diagonal, and anti-escape equipment installed. Heap soil. In the pool, a number of soil hoppers with a width of 1.3-1.5 meters and a thickness of 20-25 cm are piled. The distance between the rake and the rake is 20 centimeters and the distance from the pool wall is 20 centimeters. The earthworms are rich in organic matter, which facilitates their growth. The surface of the pool should be set on the side of the pool or in the pool so as to facilitate the breeding of land. Cultivation and cultivation. After the mound is well maintained, the water depth in the pool shall be maintained between 10 cm and 15 cm, and the “Taiping No. 2†shall be placed on a soil area of ​​2 m 3 kg per square meter. Breed. Every 3 days to 4 days, the cow dung that had been eaten by the upper layer was scraped and 4 kg – 5 kg of new fermented cow dung was added per square meter. After half a month, the quail grows in large numbers and grows some aquatic plants. A stocking density. Based on the entire pond area, stocks were stocked with 1 instar, 20 eggs, 30 eggs per square meter, 7 eggs, 2 eggs, 7 eggs, 3 eggs, 3 eggs, and 5 eggs. From April to November, the survival rate can reach more than 90%. management. After the quail species is put in, the pool water is maintained at a depth of about 15 centimeters. The water is fertile and fresh, and micro-flowing water is maintained. In the future, every 3 days to 4 days will be scraped off a layer of cow dung, then add about 4 kilograms of fermented cow dung per square meter, to ensure continuous breeding growth, feeding for feeding. At the same time, some dry bait and fresh bait can be properly fed, and the proportions are 2%-5% and 15% of the body weight respectively. In the hot season, scaffolding should be built on the water's edge.
GMP Certificated Immune Globulin Injection Supplier in China
Hepatitis B Immunoglobulin,Hep B Immunoglobulin,Hepatitis B Immunoglobulin Vaccine,Hepatitis Immune Globulin
FOSHAN PHARMA CO., LTD. , https://www.forepharm.com